Fruitvale Canal & Industrial Waste Improvements
/Project Owner: City of Yakima
Engineers: Huibregtse, Louman Associates, Inc.
Installed 4,500’ 30” HDPE (fusion welded), 3,200’ 6” SDR 35, 3,200’ 4” SDR 35, 246’ 32” steel casing, 166’ 10” steel casing, 166’ 8” steel casing, 166’ 6” SDR 21, 166’ 4” SDR 21, 310’ 10” C-900, 340’ 8” C-900, 585’ 24” Cl. 50 D.I., constructed new concrete head walls and HMA paving.