Frazer Creek Bridges

Consulting Engineer:  Jay Kidder, P.E., Chinook Engineering

Project Owner: Methow Salmon Recovery Foundation

This emergency work involved replacing five culverts with pre-fabricated bridges along Frazer Creek.  Due to the Carlton Complex Fires, the land owners along Frazer Creek experienced unforeseen flooding on their properties adjacent Frazer Creek; some driveways were completely washed out.  The project involved a significant amount of dewatering of the stream, removal of existing culverts, removal and stream channel construction with angular shot, river rock and boulders and construction, placement, of the pre-fabricated bridges.